IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0024 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,414 $0 Implemented
AS0024 # 08 Y:1991 08 1991 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $3,287 $900 Implemented
AS0024 # 09 Y:1991 09 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,962 $2,000 Implemented
AS0025 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,398 $10,675 Not Implemented
AS0025 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,118 $2,200 Not Implemented
AS0025 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,333 $2,000 Not Implemented
AS0025 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $343 Not Implemented
AS0025 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264 $518 Not Implemented
AS0025 # 06 Y:1991 06 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,040 $0 Not Implemented
AS0025 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $988 Not Implemented
AS0025 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,070 $0 Not Implemented
AS0025 # 09 Y:1991 09 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,462 $712 Not Implemented
AS0025 # 10 Y:1991 10 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,049 $568 Not Implemented
AS0025 # 11 Y:1991 11 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,533 $1,000 Not Implemented
AS0025 # 12 Y:1991 12 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $210,801 $780,000 Not Implemented
MA0210 # 01 Y:1991 01 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $300 $136 Implemented
MA0210 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $191 $350 Implemented
MA0210 # 03 Y:1991 03 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $651 $2,764 Implemented
MA0210 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $47 Implemented
MA0210 # 05 Y:1991 05 1991 DIRECT WARMEST AIR TO COMBUSTION INTAKE $151 $405 Implemented
MA0210 # 06 Y:1991 06 1991 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $1,286 $2,375 Implemented
MO0023 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $7,104 Implemented
MO0023 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,664 $695 Implemented
MO0023 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,614 $820 Implemented
MO0023 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,488 $500 Implemented