IAC logo
IAC Assessment: MA0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product COTTEN,POLY BLEND SHIRTS
NAICS n/a
SIC 2321 - Men's and Boys' Shirts, Except Work Shirts
Sales $5,000,000-$10,000,000
# of Employees 180
Plant Area (Sq.Ft.) 0
Annual Production 2,880,000 Pieces
Production Hrs. Annual 2,168
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,162 282,532 kWh $0.10
Natural Gas $7,665 1,202 MMBtu $6.38
Fuel Oil #4 $8,792 1,656 MMBtu $5.31
TOTAL ENERGY COSTS $44,619
RECOMMENDED SAVINGS* $2,715 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,715
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4
$ kWh $ MMBtu $ MMBtu
01: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$300
Cost:
$136
- - $140 22 $160 30 -
-
kWh
$140
22
MMBtu
$160
30
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$191
Cost:
$350
- - $191 30 - - -
-
kWh
$191
30
MMBtu
-
-
MMBtu
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$651
Cost:
$2,764
- - $651 102 - - -
-
kWh
$651
102
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$136
Cost:
$47
$136 1,465 - - - - $136
1,465
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$151
Cost:
$405
- - $77 12 $74 14 -
-
kWh
$77
12
MMBtu
$74
14
MMBtu
06: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL Savings:
$1,286
Cost:
$2,375
- - - - $1,286 - -
-
kWh
-
-
MMBtu
$1,286
-
MMBtu
TOTAL RECOMMENDED Savings:
$2,715
Cost:
$6,077
$136 1,465 $1,059 166 $1,520 44 $136
1,465
kWh
$1,059
166
MMBtu
$1,520
44
MMBtu
TOTAL IMPLEMENTED Savings:
$2,715
Cost:
$6,077
$136 1,465 $1,059 166 $1,520 44 $136
1,465
kWh
$1,059
166
MMBtu
$1,520
44
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4