Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0365 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,420 | $68,600 | Implemented |
SD0365 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,645 | $13,000 | Implemented |
SD0365 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,076 | $1,300 | Implemented |
SD0365 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,012 | $6,000 | Implemented |
SD0365 # 09 Y:2005 | 09 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,700 | $18,500 | Not Implemented |
SD0365 # 10 Y:2005 | 10 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $261,855 | $40,000 | Implemented |
UM0283 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,568 | $6,878 | Implemented |
UM0283 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,056 | $2,500 | Implemented |
UM0283 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,024 | $300 | Implemented |
UM0283 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $873 | $3,000 | Not Implemented |
UM0283 # 05 Y:2005 | 05 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $793 | $2,117 | Not Implemented |
MI0107 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,525 | $100 | Implemented |
MI0107 # 04 Y:2005 | 04 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,012 | $4,012 | Implemented |
MI0107 # 05 Y:2005 | 05 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,325 | $42 | Implemented |
MI0107 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,128 | $0 | Implemented |
MI0107 # 01 Y:2005 | 01 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,544 | $600 | Not Implemented |
MI0107 # 02 Y:2005 | 02 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,756 | $4,360 | Not Implemented |
MA0580 # 01 Y:2005 | 01 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,175 | $6,831 | Not Implemented |
MA0580 # 02 Y:2005 | 02 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $8,663 | $10,750 | Not Implemented |
MA0580 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,371 | $34,720 | Implemented |
MA0580 # 04 Y:2005 | 04 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,798 | $1,375 | Implemented |
MA0580 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,905 | $0 | Implemented |
MA0580 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,479 | $825 | Not Implemented |
MA0580 # 07 Y:2005 | 07 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $611 | $0 | Not Implemented |
MA0580 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $444 | $0 | Not Implemented |