IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0025 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $60 Not Implemented
IP0025 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $0 Not Implemented
IP0025 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,123 $1,770 Not Implemented
IP0025 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,944 $3,961 Not Implemented
WM0045 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $1,220 Implemented
WM0046 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $132 Implemented
WM0046 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $394 $320 Implemented
WM0046 # 03 Y:2014 03 2014 IMPROVE SPACE COMFORT CONDITIONING $5,525 $595 Implemented
WM0046 # 04 Y:2014 04 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,846 $75,000 Not Implemented
WM0045 # 01 Y:2014 01 2014 RECYCLE WHITE WATER $6,827 $13,958 Not Implemented
WM0045 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,114 $2,500 Not Implemented
WM0045 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $2,701 $0 Implemented
WM0045 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,111 $2,030 Not Implemented
WM0045 # 05 Y:2014 05 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,440 $940 Not Implemented
WM0045 # 06 Y:2014 06 2014 IMPROVE SPACE COMFORT CONDITIONING $4,160 $350 Not Implemented
WM0045 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $478 $280 Implemented
WM0045 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $313 $630 Not Implemented
WM0045 # 09 Y:2014 09 2014 COVER OPEN TANKS $51 $0 Implemented
WM0045 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $100 Not Implemented
UA0122 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $26,427 $700 Not Implemented
UA0122 # 02 Y:2014 02 2014 MODIFY STARTUP/SHUTDOWN TIMES $13,749 $0 Not Implemented
UA0122 # 03 Y:2014 03 2014 COMBINE UTILITY METERS $87 $0 Not Implemented
UA0122 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,325 $12,089 Not Implemented
UA0122 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $7,195 Implemented
UA0122 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,196 $100 Implemented