Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0149 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,611 | $1,000 | Not Implemented |
UU0149 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,173 | $120 | Not Implemented |
UU0149 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,980 | $0 | Not Implemented |
UU0149 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,945 | $200 | Not Implemented |
UU0149 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $824 | $1,208 | Not Implemented |
UU0149 # 07 Y:2019 | 07 | 2019 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $797 | $1,990 | Not Implemented |
UU0149 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $495 | $286 | Not Implemented |
UU0149 # 09 Y:2019 | 09 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $391 | $300 | Not Implemented |
UU0149 # 10 Y:2019 | 10 | 2019 | INSTALL OCCUPANCY SENSORS | $322 | $402 | Not Implemented |
UF0528 # 01 Y:2019 | 01 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $6,559 | $10,250 | Not Implemented |
UF0528 # 02 Y:2019 | 02 | 2019 | INSTALL TURBULATORS | $5,011 | $7,500 | Implemented |
UF0528 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,410 | $1,400 | Not Implemented |
UF0528 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $456 | Implemented |
UF0528 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,168 | $6,439 | Not Implemented |
UF0528 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,284 | $3,000 | Implemented |
UF0528 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $2,054 | $1,025 | Implemented |
UF0528 # 08 Y:2019 | 08 | 2019 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $1,676 | $5,000 | Not Implemented |
AM0779 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,460 | $16,000 | Implemented |
AM0779 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,000 | $8,765 | Not Implemented |
AM0779 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,160 | $0 | Not Implemented |
AM0779 # 04 Y:2019 | 04 | 2019 | USE SYNTHETIC LUBRICANT | $3,033 | $0 | Not Implemented |
AM0779 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,795 | $1,000 | Implemented |
AM0779 # 06 Y:2019 | 06 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,880 | $6,600 | Not Implemented |
AM0779 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,380 | $3,300 | Implemented |
AM0779 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $240 | Not Implemented |