Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0666 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $420 | $500 | Implemented |
AM0665 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,280 | $17,710 | Implemented |
AM0665 # 02 Y:2014 | 02 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,930 | $4,000 | Not Implemented |
AM0665 # 03 Y:2014 | 03 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $34,980 | $10,000 | Implemented |
AM0665 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,080 | $2,000 | Implemented |
AM0665 # 05 Y:2014 | 05 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,020 | $1,485 | Implemented |
AM0665 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,235 | $10 | Not Implemented |
AM0665 # 07 Y:2014 | 07 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $310 | $0 | Not Implemented |
AM0664 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $46,500 | $51,870 | Not Implemented |
AM0664 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,030 | $3,600 | Implemented |
AM0664 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,750 | $12 | Not Implemented |
AM0664 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $7,770 | $1,200 | Implemented |
AM0664 # 05 Y:2014 | 05 | 2014 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $5,260 | $0 | Implemented |
AM0664 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,970 | $4,550 | Implemented |
AM0664 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $625 | $870 | Implemented |
AM0663 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,960 | $24,700 | Implemented |
AM0663 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,000 | $0 | Not Implemented |
AM0663 # 03 Y:2014 | 03 | 2014 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,730 | $0 | Implemented |
AM0663 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,790 | $55 | Implemented |
AM0663 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,445 | $0 | Not Implemented |
AM0663 # 06 Y:2014 | 06 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,158 | $4,500 | Not Implemented |
AM0663 # 07 Y:2014 | 07 | 2014 | INSTALL SKYLIGHTS | $915 | $4,140 | Not Implemented |
AM0662 # 01 Y:2014 | 01 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $72,800 | $26,790 | Implemented |
AM0662 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,492 | $23,175 | Implemented |
AM0662 # 03 Y:2014 | 03 | 2014 | PAY UTILITY BILLS ON TIME | $18,665 | $0 | Implemented |