IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0965 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,787 $55,459 Implemented
OK0965 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,915 $25,287 Not Implemented
OK0965 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,316 $6,286 Implemented
OK0965 # 04 Y:2017 04 2017 USE PHOTOCELL CONTROLS $765 $3,975 Implemented
OK0965 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $918 $3,250 Implemented
OK0965 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $858 $4,081 Implemented
OK0965 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $325 Implemented
OK0965 # 08 Y:2017 08 2017 RECOVER WASTE HEAT FROM EQUIPMENT $353 $919 Not Implemented
OK0965 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $159 $0 Not Implemented
OK0965 # 10 Y:2017 10 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,351 $0 Implemented
MZ0229 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,644 $27,718 Not Implemented
MZ0229 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,200 $112,088 Not Implemented
MZ0229 # 03 Y:2017 03 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $6,600 $1,357 Not Implemented
MZ0229 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $790 $0 Not Implemented
MZ0229 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,119 $550 Not Implemented
MZ0229 # 06 Y:2017 06 2017 REPLACE BOILER $183,230 $38,385 Not Implemented
MZ0229 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $10,775 Not Implemented
MZ0229 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $1,053 $420 Not Implemented
MZ0229 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,449 $50 Not Implemented
MZ0229 # 10 Y:2017 10 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,300 $150,000 Not Implemented
LS0002 # 01 Y:2017 01 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,531 $0 Not Implemented
LS0002 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,634 $0 Not Implemented
LS0002 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $1,124 $0 Not Implemented
LS0002 # 04 Y:2017 04 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $16,140 $0 Not Implemented
LS0002 # 05 Y:2017 05 2017 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $271,330 $0 Not Implemented