IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0243 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $133 $227 Implemented
OK0243 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $68 $0 Implemented
OK0244 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $301 $159 Implemented
OK0244 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $255 Implemented
OK0244 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $302 $420 Implemented
OK0244 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $0 Implemented
OK0244 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,766 $1,040 Implemented
OK0244 # 06 Y:1988 06 1988 INSTALL SET-BACK TIMERS $415 $115 Implemented
OK0244 # 07 Y:1988 07 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $172 $20 Not Implemented
OK0244 # 08 Y:1988 08 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $717 $380 Not Implemented
OK0244 # 09 Y:1988 09 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $332 $275 Implemented
OK0247 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $147 $400 Implemented
OK0247 # 02 Y:1988 02 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $0 Not Implemented
OK0247 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $574 $0 Implemented
OK0247 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,222 $645 Implemented
OK0247 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $142 Implemented
OK0247 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $447 Implemented
AM0018 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $1,000 Implemented
AM0018 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $746 $77 Not Implemented
AM0018 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $210 $0 Implemented
AM0018 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $156 $350 Implemented
AM0018 # 05 Y:1988 05 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $773 $280 Not Implemented
AM0018 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN WATER LINES AND VALVES $162 $70 Implemented
AM0019 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,753 $12,132 Implemented
AM0019 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,617 $520 Implemented