Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS0002 # 06 Y:2017 | 06 | 2017 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $8,736 | $0 | Not Implemented |
LE0436 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,786 | $1,000 | Implemented |
LE0436 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,929 | $15,805 | Implemented |
LE0436 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,297 | $7,000 | Not Implemented |
LE0436 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,174 | $3,600 | Implemented |
LE0436 # 05 Y:2017 | 05 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $23,395 | $32,000 | Not Implemented |
LE0436 # 06 Y:2017 | 06 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,358 | $7,000 | Not Implemented |
LE0436 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $513 | $1,683 | Implemented |
LE0436 # 08 Y:2017 | 08 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,120 | $63,000 | Not Implemented |
UD0967 # 05 Y:2017 | 05 | 2017 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,793 | $4,925 | Not Implemented |
UD0967 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,466 | $5,000 | Not Implemented |
UD0967 # 07 Y:2017 | 07 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $89,503 | $0 | Implemented |
UD0967 # 08 Y:2017 | 08 | 2017 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $32,400 | $4,662 | Implemented |
UD0967 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,781 | $48,000 | Not Implemented |
UD0967 # 10 Y:2017 | 10 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,958 | $0 | Not Implemented |
UD0967 # 11 Y:2017 | 11 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,362 | $0 | Not Implemented |
UD0967 # 12 Y:2017 | 12 | 2017 | INSULATE BARE EQUIPMENT | $6,116 | $2,824 | Not Implemented |
UD0967 # 13 Y:2017 | 13 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,271 | $4,000 | Not Implemented |
UD0967 # 14 Y:2017 | 14 | 2017 | MINIMIZE WATER USAGE | $13,765 | $6,000 | Implemented |
UD0967 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,735 | $14,110 | Not Implemented |
UD0967 # 16 Y:2017 | 16 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $121,762 | $503,900 | Not Implemented |
UD0967 # 17 Y:2017 | 17 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,764 | $0 | Implemented |
UD0967 # 18 Y:2017 | 18 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $15,207 | $65,253 | Not Implemented |
UD0967 # 19 Y:2017 | 19 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,773 | $3,825 | Not Implemented |
UM0486 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,932 | $3,000 | n/a |