IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0152 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,770 $400 Not Implemented
AM0152 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,400 $0 Not Implemented
AM0152 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $1,080 Not Implemented
AM0153 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,980 $420 Implemented
AM0153 # 02 Y:1992 02 1992 PAY UTILITY BILLS ON TIME $1,768 $0 Implemented
AM0153 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,230 $3,386 Implemented
AM0153 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,929 $0 Implemented
AM0153 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $746 $640 Implemented
AM0153 # 06 Y:1992 06 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $215 $215 Not Implemented
AM0153 # 07 Y:1992 07 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $160 $360 Not Implemented
AM0153 # 08 Y:1992 08 1992 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $140 $120 Implemented
AM0154 # 01 Y:1992 01 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,580 $4,050 Not Implemented
AM0154 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,142 $80 Not Implemented
AM0154 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $0 Implemented
AM0154 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $979 $440 Implemented
AS0055 # 01 Y:1992 01 1992 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $16,293 $64,125 Not Implemented
AS0055 # 02 Y:1992 02 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,736 $68,000 Not Implemented
AS0055 # 03 Y:1992 03 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,959 $10,500 Not Implemented
AS0055 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $961 $2,033 Not Implemented
AS0055 # 05 Y:1992 05 1992 USE OPTIMUM THICKNESS INSULATION $727 $3,700 Not Implemented
AS0055 # 06 Y:1992 06 1992 USE HEAT PUMP FOR SPACE CONDITIONING $15,185 $26,340 Not Implemented
AS0055 # 07 Y:1992 07 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,710 $2,400 Not Implemented
AS0055 # 08 Y:1992 08 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $441 $1,200 Not Implemented
AS0055 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,731 $6,791 Not Implemented
AS0055 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $236 Not Implemented