IAC logo
IAC Assessment: AM0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product MILK
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 3,744 Thousand Gallons
Production Hrs. Annual 4,472
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,457 3,338,804 kWh $0.05
Natural Gas $67,686 15,746 MMBtu $4.30
TOTAL ENERGY COSTS $251,143
RECOMMENDED SAVINGS* $42,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$23,665
Cost:
$13,890
- - $23,665 5,506 -
-
kWh
$23,665
5,506
MMBtu
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$6,790
Cost:
$6,500
- - $6,790 1,580 -
-
kWh
$6,790
1,580
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,300
Cost:
$5,610
$5,300 72,685 - - $5,300
72,685
kWh
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,770
Cost:
$400
$3,770 - - - $3,770
-
kWh
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,400
Cost:
-
$2,400 55,686 - - $2,400
55,686
kWh
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,010
Cost:
$1,080
$1,010 23,447 - - $1,010
23,447
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$42,935
Cost:
$27,480
$12,480 151,818 $30,455 7,086 $12,480
151,818
kWh
$30,455
7,086
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas