IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0538 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $4,860 Implemented
GT0538 # 08 Y:1994 08 1994 AIR CONDITION ONLY SPACE NECESSARY $22,300 $1,890 Not Implemented
GT0538 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228,100 $770,000 Not Implemented
CO0307 # 01 Y:1994 01 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,670 $250 Implemented
CO0307 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $6,360 Not Implemented
CO0307 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,940 $160 Implemented
CO0307 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,050 $500 Not Implemented
CO0307 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $4,520 Not Implemented
CO0307 # 06 Y:1994 06 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $340 $980 Not Implemented
OD0006 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $4,164 $1,700 Not Implemented
OD0006 # 02 Y:1994 02 1994 MINIMIZE WATER USAGE $9,575 $1,920 Not Implemented
OD0006 # 03 Y:1994 03 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $190 $170 Implemented
OD0006 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $420 $380 Implemented
OD0006 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $887 $1,612 Implemented
OD0006 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $6,574 Implemented
ME0135 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $390 $450 Implemented
ME0135 # 02 Y:1994 02 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $817 $350 Implemented
ME0135 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,700 $4,000 Not Implemented
ME0135 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $760 $600 Not Implemented
ME0135 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $5,300 Not Implemented
ME0135 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,146 $500 Not Implemented
ME0135 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,900 $600 Implemented
ME0135 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $692 $0 Not Implemented
WV0038 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $3,491 Implemented
WV0038 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,081 $118,620 Implemented