Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0478 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,978 | $3,229 | Implemented |
BD0478 # 02 Y:2016 | 02 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,345 | $15 | Not Implemented |
BD0478 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,961 | $15 | Implemented |
BD0478 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,217 | $1,000 | Implemented |
BD0478 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,111 | $575 | Not Implemented |
BD0478 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $784 | $900 | Implemented |
BD0478 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $751 | $450 | Not Implemented |
BD0478 # 08 Y:2016 | 08 | 2016 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $13,019 | $7,560 | Implemented |
WV0525 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,826 | $10,031 | Implemented |
WV0525 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,504 | $362 | Implemented |
WV0525 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,290 | $6,270 | Implemented |
WV0525 # 04 Y:2016 | 04 | 2016 | INSTALL SET-BACK TIMERS | $3,716 | $4,223 | Not Implemented |
WV0525 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,568 | $1,114 | Not Implemented |
WV0525 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $2,799 | $5,000 | Not Implemented |
WV0525 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,575 | $4,088 | Implemented |
WV0525 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $640 | $11 | Implemented |
MI0295 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,797 | $59,670 | Not Implemented |
MI0295 # 02 Y:2016 | 02 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $26,678 | $80,000 | Not Implemented |
MI0295 # 03 Y:2016 | 03 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $17,275 | $4,471 | Not Implemented |
MI0295 # 04 Y:2016 | 04 | 2016 | USE PHOTOCELL CONTROLS | $11,307 | $10,380 | Not Implemented |
MI0295 # 05 Y:2016 | 05 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,874 | $40 | Not Implemented |
MI0295 # 06 Y:2016 | 06 | 2016 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $7,334 | $4,411 | Not Implemented |
MI0295 # 07 Y:2016 | 07 | 2016 | PAY UTILITY BILLS ON TIME | $4,723 | $0 | Not Implemented |
MI0295 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,957 | $1,660 | Not Implemented |
MI0295 # 09 Y:2016 | 09 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,084 | $320 | Not Implemented |