IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0224 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $936,645 $8,400,000 n/a
MS0224 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $351,990 $119,086 n/a
MS0224 # 03 Y:2003 03 2003 INSTALL STEAM TRAP $76,374 $12,262 Not Implemented
MS0224 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,515 $153,750 Not Implemented
MS0224 # 05 Y:2003 05 2003 MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM $37,053 $70,000 n/a
MS0224 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,243 $26,302 Implemented
MS0224 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,018 $50,000 n/a
MS0224 # 08 Y:2003 08 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $12,652 $0 Not Implemented
MS0224 # 09 Y:2003 09 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,477 $1,560 Not Implemented
MS0224 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,641 $181 Implemented
MS0224 # 11 Y:2003 11 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,861 $7,596 Implemented
MS0224 # 12 Y:2003 12 2003 INSULATE BARE EQUIPMENT $3,422 $301 Not Implemented
SF0262 # 01 Y:2003 01 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $144,108 $26,738 Not Implemented
SF0262 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $1,596 $619 Not Implemented
SF0262 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,281 $564 Not Implemented
SF0262 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,464 $5,555 Implemented
SF0262 # 05 Y:2003 05 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,013 $2,748 Implemented
SF0262 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $355 $360 Not Implemented
SF0262 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $2,530 $3,638 Implemented
SF0262 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,502 $19,608 Not Implemented
SF0262 # 09 Y:2003 09 2003 REPLACE BOILER $39,608 $155,089 Not Implemented
SF0262 # 10 Y:2003 10 2003 RECOVER AND REUSE COOLING WATER $4,190 $6,871 Not Implemented
LM0063 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $140 Implemented
LM0063 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,129 $0 Implemented
LM0063 # 03 Y:2003 03 2003 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $80 $30 Implemented