IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0625 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,150 $17,870 Not Implemented
CO0625 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,160 $30,500 Not Implemented
CO0625 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $680 $2,020 Not Implemented
CO0625 # 05 Y:2009 05 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $210 Not Implemented
CO0625 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,200 $1,500 Not Implemented
MZ0039 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,863 $0 Implemented
MZ0039 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0039 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,883 $510,446 Implemented
MZ0039 # 05 Y:2009 05 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $15,679 $18,600 Implemented
MZ0039 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,294 $8,400 Implemented
UM0355 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,008 $8,286 Implemented
UM0355 # 04 Y:2009 04 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,314 $500 Implemented
UM0355 # 03 Y:2009 03 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,372 $500 Not Implemented
UM0355 # 05 Y:2009 05 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $912 Implemented
UM0355 # 01 Y:2009 01 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,255 $18,000 Not Implemented
WV0392 # 08 Y:2009 08 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,814 $5,000 Not Implemented
WV0392 # 07 Y:2009 07 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,252 $392 Implemented
WV0392 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,132 $1,667 Implemented
WV0392 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,773 $18,784 Implemented
WV0392 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,525 $2,660 Not Implemented
WV0392 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,526 $6,750 Not Implemented
WV0392 # 06 Y:2009 06 2009 DEVELOP A REPAIR/REPLACE POLICY $3,444 $681 Implemented
WV0392 # 05 Y:2009 05 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,417 $1,000 Implemented
WV0392 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $660 Not Implemented
WV0392 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,192 $0 Implemented