Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0959 # 05 Y:2021 | 05 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,169 | $23,000 | Not Implemented |
GT0959 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,630 | $621,000 | Not Implemented |
GT0959 # 04 Y:2021 | 04 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $170 | $315 | Implemented |
GT0959 # 01 Y:2021 | 01 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,495 | $800 | Implemented |
GT0959 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $184 | $50 | Implemented |
GT0959 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,641 | $1,850 | Implemented |
SD0621 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,020 | $4,132 | Not Implemented |
SD0621 # 04 Y:2021 | 04 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $732 | $0 | Not Implemented |
SD0621 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,319 | $0 | Implemented |
SD0621 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,887 | $10,000 | Implemented |
MI0397 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,631 | $40 | Implemented |
MI0397 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,589 | $480 | Not Implemented |
MI0397 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,361 | $40 | Implemented |
MI0397 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,160 | $4,555 | Not Implemented |
MI0397 # 03 Y:2021 | 03 | 2021 | METER WASTE WATER | $2,172 | $1,380 | Not Implemented |
MI0397 # 02 Y:2021 | 02 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $2,751 | $480 | Not Implemented |
MI0395 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $811 | Implemented |
MI0395 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,523 | $1,980 | Implemented |
MI0395 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,603 | $2,100 | Not Implemented |
MI0395 # 05 Y:2021 | 05 | 2021 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $5,744 | $26,640 | Not Implemented |
MI0395 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $613 | $255 | Implemented |
MI0395 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,790 | $1,380 | Implemented |
MI0395 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,816 | $15,328 | Not Implemented |
MI0393 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,748 | $2,211 | Implemented |
MI0393 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO HEAT WATER | $12,942 | $72,248 | Not Implemented |