IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,957

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0891 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,700 $1,000 Implemented
AM0891 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $47 $165 Implemented
AM0891 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,490 $4,220 Implemented
AM0891 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $47,100 $10,000 Implemented
AM0891 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $2,710 $7,275 Implemented
WV0652 # 05 Y:2023 05 2023 DEVELOP A REPAIR/REPLACE POLICY $13,792 $1,942 Implemented
WV0652 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $22,798 $1,500 Implemented
WV0652 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,902 $2,750 Implemented
WV0652 # 04 Y:2023 04 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,975 $1,500 Implemented
WV0652 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,967 $2,160 Implemented
WV0652 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,118 $7,210 Implemented
WV0652 # 10 Y:2023 10 2023 INSULATE BARE EQUIPMENT $506 $166 Implemented
UU0225 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,874 $0 Implemented
UU0225 # 01 Y:2023 01 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,842 $126,388 Implemented
UU0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,047 $11,922 Implemented
UU0225 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,851 $2,775 Implemented
UU0225 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,399 $15,200 Implemented
MZ0345 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,738 $3,090 Implemented
MZ0345 # 06 Y:2023 06 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,711 $1,945 Implemented
MZ0345 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,404 $14,030 Implemented
MZ0345 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,065 $22,618 Implemented
MZ0345 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,287 $840 Implemented
MZ0345 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,154 $220 Implemented
UU0222 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,896 $2,400 Implemented
UU0222 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,013 $540 Implemented