Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
235
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0013 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,856 | $0 | Implemented |
UA0013 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $17,411 | $13,088 | Implemented |
UA0013 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,315 | $47,838 | Implemented |
UA0013 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,423 | $700 | Implemented |
UA0013 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,905 | $0 | Not Implemented |
UA0013 # 06 Y:2007 | 06 | 2007 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,112 | $6,898 | Not Implemented |
UA0013 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM THICKNESS INSULATION | $3,027 | $279 | Not Implemented |
SF0349 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,490 | $1,992 | Implemented |
SF0349 # 13 Y:2007 | 13 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $980 | Not Implemented |
SF0349 # 11 Y:2007 | 11 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,597 | $52,080 | Not Implemented |
SF0349 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,554 | $4,281 | Implemented |
SF0349 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,139 | $10,019 | Not Implemented |
SF0349 # 08 Y:2007 | 08 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,042 | $2,339 | Not Implemented |
SF0349 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,603 | $150 | Not Implemented |
SF0349 # 12 Y:2007 | 12 | 2007 | USE PHOTOCELL CONTROLS | $3,302 | $9,569 | Implemented |
SF0349 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $725 | $757 | Implemented |
SF0349 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $0 | Implemented |
SF0349 # 07 Y:2007 | 07 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,644 | $8,646 | Not Implemented |
SF0349 # 09 Y:2007 | 09 | 2007 | COVER OPEN TANKS | $12,984 | $14,940 | Not Implemented |
SF0349 # 14 Y:2007 | 14 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,454 | $11,000 | Not Implemented |
SF0349 # 01 Y:2007 | 01 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $6,853 | $0 | Implemented |
SF0349 # 15 Y:2007 | 15 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,751 | $37,915 | Not Implemented |
UM0330 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,750 | $12,000 | Not Implemented |
UM0330 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $1,775 | $516 | Not Implemented |
UM0330 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,366 | $5,250 | Not Implemented |