IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 3341 Computer and Peripheral Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0588 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,633 $32,287 Implemented
SD0588 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,578 $7,495 Implemented
SD0588 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $812 $1,395 Implemented
SD0588 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $0 Implemented
SF0543 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $6,639 $23,288 Implemented
SF0543 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,652 $12,363 Implemented
SF0543 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,245 $4,917 Implemented
SF0543 # 03 Y:2019 03 2019 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $637 $654 Implemented
SF0543 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,772 $757 Implemented
SF0543 # 02 Y:2019 02 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $24,608 $15,012 Implemented
MI0355 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,941 $59,135 Implemented
MI0355 # 09 Y:2019 09 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,604 $2,070 Implemented
MI0355 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,441 $72,870 Implemented
MI0355 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $103,161 $14,000 Implemented
SD0557 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,478 $600 Implemented
SD0557 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,570 $1,860 Implemented
SD0557 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,245 $900 Implemented
SD0557 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,225 $3,775 Implemented
BS0069 # 05 Y:2015 05 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $198 $374 Implemented
BS0069 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99 $576 Implemented
BS0069 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $879 $503 Implemented
BS0069 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,145 Implemented
SU0393 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,733 $0 Implemented
SU0393 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,381 $775 Implemented
SU0393 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $3,091 $1,521 Implemented