IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0148 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,910 $36 Implemented
KU0148 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $760 $0 Implemented
KU0148 # 04 Y:1984 04 1984 INSTALL AUTOMATIC STACK DAMPER $436 $700 Implemented
KU0148 # 09 Y:1984 09 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $298 $12 Implemented
KU0148 # 13 Y:1984 13 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,182 $2,000 Implemented
KU0148 # 10 Y:1984 10 1984 REDUCE VENTILATION AIR $2,954 $500 Implemented
KU0148 # 11 Y:1984 11 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,658 $15,000 Not Implemented
KU0148 # 07 Y:1984 07 1984 INSULATE BARE EQUIPMENT $1,738 $1,240 Not Implemented
KU0148 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,754 $3,000 Implemented
KU0148 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $514 $800 Implemented
KU0148 # 15 Y:1984 15 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,508 $1,900 Not Implemented
KU0148 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $173 $70 Not Implemented
KU0148 # 08 Y:1984 08 1984 RECOVER WASTE HEAT FROM EQUIPMENT $99 $150 Not Implemented
KU0148 # 05 Y:1984 05 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $366 $100 Implemented
KU0148 # 12 Y:1984 12 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,177 $17 Implemented
TN0236 # 02 Y:1984 02 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,363 $5,000 Not Implemented
MA0008 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,034 $90 Not Implemented
MA0008 # 01 Y:1984 01 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $79 $0 Implemented
MA0008 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $623 $1,079 Implemented
MA0008 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $359 $209 Not Implemented
TN0236 # 05 Y:1984 05 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $980 $1,550 Not Implemented
TN0236 # 04 Y:1984 04 1984 COVER OPEN TANKS $727 $54 Not Implemented
TN0236 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $2,851 $62 Not Implemented
TN0236 # 01 Y:1984 01 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $2,574 $836 Implemented
TN0221 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $773 $475 Implemented