ID # Year Products Savings Cost Status
OR0682 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $104,297 $70,000 Not Implemented
OR0682 # 02 Y:2017 02 2017 REPLACE BOILER $4,289 $23,625 Not Implemented
OR0682 # 03 Y:2017 03 2017 REPLACE BOILER $1,937 $9,815 Not Implemented
OR0681 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,360 $532 Not Implemented
OR0681 # 02 Y:2017 02 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,375 $2,995 Not Implemented
OR0681 # 01 Y:2017 01 2017 USE OPTIMUM TEMPERATURE $7,040 $0 Not Implemented
BS0092 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,692 $3,161 Not Implemented
BS0092 # 03 Y:2016 03 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,842 $464 Not Implemented
BS0092 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,891 $3,900 Not Implemented
BS0092 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $12,593 $2,530 Not Implemented
BS0092 # 01 Y:2016 01 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $84,096 $646,400 Not Implemented
BS0092 # 04 Y:2016 04 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,190 $6,640 Not Implemented
OR0680 # 03 Y:2017 03 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000 Implemented
OR0680 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,714 $13,620 Not Implemented
OR0680 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,852 $150,000 Not Implemented
OR0680 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,732 $3,529 Implemented
OR0680 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392 Implemented
BS0045 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $986 $1,373 Not Implemented
BS0045 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,833 $5,036 Not Implemented
BS0045 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,790 $13,052 Not Implemented
BS0045 # 03 Y:2014 03 2014 PAY UTILITY BILLS ON TIME $7,864 $122 Not Implemented
BS0045 # 02 Y:2014 02 2014 USE OPTIMUM THICKNESS INSULATION $1,553 $2,600 Not Implemented
BS0045 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $6,415 $10,400 Not Implemented
BS0044 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $9,004 $6,600 Implemented
BS0044 # 04 Y:2014 04 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,828 $9,000 Implemented