Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0291 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $688 | $3,738 | n/a |
UA0291 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $107 | $452 | n/a |
UA0291 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,753 | $500 | n/a |
UA0291 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $178,998 | $1,000,734 | n/a |
UA0291 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $531 | $1,463 | n/a |
UA0291 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,693 | $8,473 | n/a |
UA0290 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,760 | $8,397 | n/a |
UA0290 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,530 | $5,091 | n/a |
UA0290 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $81,410 | $555,652 | n/a |
UA0290 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $10,563 | $56,271 | n/a |
UA0290 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $224 | $224 | n/a |
UA0290 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,200 | $500 | n/a |
UA0290 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $348 | $452 | n/a |
UA0290 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,137 | $2,005 | n/a |
UA0289 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,141 | $6,733 | n/a |
UA0289 # 09 Y:2024 | 09 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $48,585 | $5,495 | n/a |
UA0289 # 10 Y:2024 | 10 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,219 | $79 | n/a |
UA0289 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $4,334 | $6,800 | n/a |
UA0289 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,555 | $8,591 | n/a |
UA0289 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,789 | $22,563 | n/a |
UA0289 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $218,857 | $1,056,464 | n/a |
UA0289 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $330,998 | $8,608,788 | n/a |
UA0289 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,427 | $1,000 | n/a |
UA0289 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,369 | $17,266 | n/a |
UA0288 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,656 | $994 | n/a |