IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

222

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0035 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,839 $1,000 Implemented
AR0018 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,756 $800 Implemented
AR0018 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,336 $1,140 Implemented
AR0018 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,883 $533 Implemented
AR0018 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,234 $350 Implemented
AR0018 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,532 $5,850 Implemented
AR0018 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $38,242 $143,000 Not Implemented
AR0018 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $250 Not Implemented
AR0018 # 08 Y:1994 08 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,672 $400 Not Implemented
AR0018 # 09 Y:1994 09 1994 OPTIMIZE PLANT POWER FACTOR $22,502 $10,950 Not Implemented
LT0137 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,880 $0 Implemented
LT0137 # 02 Y:1988 02 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,475 $20,000 Not Implemented
LT0137 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $1,250 $1,785 Not Implemented
LT0137 # 04 Y:1988 04 1988 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $17,073 $6,027 Not Implemented
LT0137 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,085 $600 Not Implemented
LT0137 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $695 $0 Not Implemented
LT0137 # 07 Y:1988 07 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,020 $1,855 Not Implemented
LT0137 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38 $37 Not Implemented
LT0076 # 01 Y:1986 01 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $6,000 $100 Not Implemented
LT0076 # 02 Y:1986 02 1986 OPTIMIZE PLANT POWER FACTOR $5,900 $5,100 Not Implemented
LT0076 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $870 $300 Implemented
LT0076 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,105 $463 Implemented
LT0076 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $730 Implemented
LT0076 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $94 Implemented
LT0076 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,904 $2,885 Not Implemented