Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0237 # 07 Y:2020 | 07 | 2020 | METER WASTE WATER | $6,876 | $2,000 | Implemented |
TT0237 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,896 | $10 | Implemented |
TT0237 # 11 Y:2020 | 11 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $339 | $653 | Not Implemented |
TT0237 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $760 | Implemented |
TT0237 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,785 | $4,720 | Not Implemented |
TT0237 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,248 | $3,360 | Implemented |
TT0237 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,481 | $13,500 | Not Implemented |
TT0237 # 06 Y:2020 | 06 | 2020 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $6,985 | $480 | Not Implemented |
TT0237 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,445 | $0 | Implemented |
TT0237 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,403 | $33,173 | Implemented |
TT0237 # 05 Y:2020 | 05 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $11,220 | $20 | Implemented |
OK0692 # 09 Y:2004 | 09 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $663,000 | $130,000 | Not Implemented |
OK0692 # 08 Y:2004 | 08 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $17,464 | $5,050 | Not Implemented |
OK0692 # 07 Y:2004 | 07 | 2004 | $8,800 | $0 | Implemented | |
OK0692 # 06 Y:2004 | 06 | 2004 | INSTALL SET-BACK TIMERS | $81,447 | $10,000 | Implemented |
OK0692 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,577 | $11,882 | Implemented |
OK0692 # 05 Y:2004 | 05 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,389 | $6,675 | Not Implemented |
OK0692 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,221 | $8,625 | Implemented |
OK0692 # 03 Y:2004 | 03 | 2004 | USE COMPRESSOR AIR FILTERS | $5,114 | $7,875 | Not Implemented |
OK0692 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,206 | $10,250 | Not Implemented |
OK0692 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,239 | $2,275 | Implemented |
OK0692 # 11 Y:2004 | 11 | 2004 | INSTALL OCCUPANCY SENSORS | $1,911 | $1,690 | Not Implemented |
AR0156 # 06 Y:1999 | 06 | 1999 | $24,235 | $14,500 | Not Implemented | |
AR0156 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $564 | $170 | Implemented |
AR0156 # 04 Y:1999 | 04 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $82 | $0 | Implemented |