Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,380
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0603 # 04 Y:2025 | 04 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $18,772 | $291 | n/a |
AS0603 # 02 Y:2025 | 02 | 2025 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $279,654 | $313,240 | n/a |
AS0603 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,156 | $949 | n/a |
AS0603 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,434 | $1,040,663 | n/a |
AS0603 # 01 Y:2025 | 01 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $320,000 | $104,670 | n/a |
AS0603 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,172 | $545 | n/a |
AS0603 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $478 | $246 | n/a |
AS0601 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $105 | $180 | n/a |
AS0600 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,357 | $495 | n/a |
AS0600 # 01 Y:2025 | 01 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $274,416 | $2,377,539 | n/a |
AS0601 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $852 | $3,546 | n/a |
AS0600 # 03 Y:2025 | 03 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $8,750 | $276 | n/a |
AS0600 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $312 | $279 | n/a |
AS0601 # 01 Y:2025 | 01 | 2025 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $130,000 | $66,000 | n/a |
AS0601 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,962 | $176,288 | n/a |
AS0601 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $416 | $942 | n/a |
AS0601 # 04 Y:2025 | 04 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,347 | $618 | n/a |
AS0601 # 02 Y:2025 | 02 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $76,561 | $120,000 | n/a |
AS0600 # 06 Y:2025 | 06 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,132 | $39 | n/a |
AS0600 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,289 | $15,555 | n/a |
AS0600 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,872 | $274,416 | n/a |
AS0599 # 02 Y:2025 | 02 | 2025 | REDESIGN PROCESS | $778,933 | $500,000 | n/a |
AS0599 # 03 Y:2025 | 03 | 2025 | INSTALL BACK-UP EQUIPMENT | $297,917 | $1,360,000 | n/a |
AS0599 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,723 | $5,870 | n/a |
AS0599 # 01 Y:2025 | 01 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $625,275 | $321,478 | n/a |