IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0479 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,215 $200 Implemented
AS0479 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,108 $6,016 Implemented
AS0479 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $1,596 $4,600 Not Implemented
AS0475 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,779 $895 Implemented
AS0475 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,577 $20,083 Not Implemented
AS0475 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,094 $5,938 Implemented
AS0475 # 06 Y:2019 06 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $411 $236 Not Implemented
AS0475 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $159 $752 Implemented
AS0475 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $23 Not Implemented
AS0475 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $1,166 Not Implemented
AS0475 # 04 Y:2019 04 2019 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $2,515 $7,906 Not Implemented
AS0472 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $95,737 $8,636 Not Implemented
AS0472 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $20,091 $41,520 Not Implemented
AS0472 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,102 $53,286 Not Implemented
AS0472 # 04 Y:2019 04 2019 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $4,878 $6,000 Not Implemented
AS0472 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,692 $770 Implemented
AS0469 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,924 $37,163 Not Implemented
AS0469 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,906 $420 Not Implemented
AS0469 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,578 $900 Not Implemented
AS0469 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $4,029 $14,835 Not Implemented
AS0469 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,730 $10,305 Not Implemented
AS0451 # 05 Y:2018 05 2018 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $7,840 $5 Not Implemented
AS0451 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,269 $18,026 Not Implemented
AS0451 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $762 $0 Not Implemented
AS0451 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,644 $1,725 Not Implemented