Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0508 # 06 Y:2017 | 06 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,181 | $6,155 | Not Implemented |
SF0508 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,954 | $26,825 | Implemented |
SF0508 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,172 | $20,431 | Not Implemented |
SF0508 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,154 | $0 | Implemented |
SF0508 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,198 | $2,023 | Implemented |
SF0508 # 03 Y:2017 | 03 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $640 | $553 | Not Implemented |
SF0502 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,509 | $80 | Implemented |
SF0502 # 10 Y:2017 | 10 | 2017 | INSULATE BARE EQUIPMENT | $13,080 | $26,316 | Not Implemented |
SF0502 # 06 Y:2017 | 06 | 2017 | REDESIGN PROCESS | $46,628 | $18,660 | Implemented |
SF0502 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $76,288 | $138,203 | Implemented |
SF0502 # 08 Y:2017 | 08 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,335 | $14,290 | Implemented |
SF0502 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $379,684 | $84,889 | Implemented |
SF0502 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,648 | $2,311 | Implemented |
SF0502 # 04 Y:2017 | 04 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $25,335 | $7,208 | Not Implemented |
SF0502 # 05 Y:2017 | 05 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $21,631 | $14,971 | Implemented |
SF0502 # 11 Y:2017 | 11 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,617 | $187,946 | Not Implemented |
SF0502 # 09 Y:2017 | 09 | 2017 | INSULATE FEEDWATER TANK | $1,760 | $3,244 | Not Implemented |
SF0501 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,360 | $665,154 | Not Implemented |
SF0501 # 05 Y:2017 | 05 | 2017 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,356 | $1,821 | Not Implemented |
SF0501 # 04 Y:2017 | 04 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,074 | $1,769 | Implemented |
SF0501 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $84 | Not Implemented |
SF0501 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,047 | $0 | Not Implemented |
SF0501 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,520 | $0 | Implemented |
SF0500 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,907 | $0 | Implemented |
SF0500 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $760 | $2,070 | Not Implemented |