IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0585 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $8,453 Implemented
SD0585 # 02 Y:2019 02 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,628 $12,000 Not Implemented
SD0585 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $2,603 $200 Implemented
SD0585 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $2,188 $3,520 Not Implemented
SD0585 # 05 Y:2019 05 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,928 $14,000 Not Implemented
SD0578 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $307 $450 Implemented
SD0578 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $285 $315 Not Implemented
SD0578 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $330 $816 Implemented
SD0578 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,296 $1,058 Implemented
SF0534 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,333 $31,340 Implemented
SF0534 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,765 $14,350 Implemented
SF0534 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $562 $946 Not Implemented
SF0534 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,579 $4,190 Not Implemented
SF0534 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,648 $728 Implemented
SF0534 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,731 $31,790 Not Implemented
SF0534 # 07 Y:2019 07 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,172 $1,636 Implemented
SF0534 # 08 Y:2019 08 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $170,541 $650,232 Not Implemented
SF0533 # 09 Y:2019 09 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,925 $3,138 Not Implemented
SF0533 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,765 $2,729 Not Implemented
SF0533 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $163 Not Implemented
SF0533 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,888 $3,120 Not Implemented
SF0533 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,489 $4,651 Not Implemented
SF0533 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,254 $4,129 Not Implemented
SF0533 # 03 Y:2019 03 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $39,996 $12,500 Not Implemented
SF0533 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $5,167 $1,440 Not Implemented