IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

373

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0516 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $797 $1,500 Implemented
SD0516 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,238 $200 Implemented
SD0516 # 04 Y:2015 04 2015 USE PHOTOCELL CONTROLS $1,539 $1,295 Implemented
SD0516 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $2,406 $2,370 Not Implemented
SD0516 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,584 $3,900 Implemented
SD0516 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,830 $48,900 Implemented
SF0465 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,736 $26,646 Implemented
SF0465 # 04 Y:2015 04 2015 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $914 $1,510 Not Implemented
SF0465 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,965 $3,081 Not Implemented
SF0465 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,344 $648 Implemented
SF0465 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,904 $0 Not Implemented
SD0478 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $2,220 $4,625 Implemented
SD0478 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,630 $2,535 Implemented
SD0478 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,128 $500 Implemented
SD0478 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,342 $32,990 Not Implemented
SD0478 # 01 Y:2014 01 2014 REDUCE SCRAP PRODUCTION $30,811 $12,465 Implemented
SF0439 # 12 Y:2013 12 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,184 $91,986 Not Implemented
SF0439 # 13 Y:2013 13 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,151 $18,136 Not Implemented
SF0439 # 14 Y:2013 14 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $370 $1,980 Not Implemented
SF0439 # 15 Y:2013 15 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,319 $118,398 Not Implemented
SF0439 # 11 Y:2013 11 2013 INSTALL OCCUPANCY SENSORS $6,030 $22,132 Not Implemented
SF0439 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,646 $8,690 Not Implemented
SF0439 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,058 $18,484 Not Implemented
SF0439 # 08 Y:2013 08 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,037 $10,104 Implemented
SF0439 # 07 Y:2013 07 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $3,902 $3,286 Not Implemented