IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0045 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,148 $380 Not Implemented
SD0100 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,434 $2,000 Implemented
SD0100 # 09 Y:1994 09 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $89 $50 Implemented
SD0100 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $1,542 $607 Not Implemented
SF0045 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $617 $185 Not Implemented
SF0045 # 03 Y:1994 03 1994 USE OPTIMUM THICKNESS INSULATION $1,262 $773 Implemented
SF0045 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $761 Not Implemented
SD0100 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,131 $7,029 Not Implemented
SD0100 # 08 Y:1994 08 1994 USE PHOTOCELL CONTROLS $2,123 $1,278 Not Implemented
SD0100 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $206 $380 Not Implemented
SD0100 # 06 Y:1994 06 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $4,373 $3,675 Implemented
SF0045 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $917 $2,200 Implemented
SD0100 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93 $140 Implemented
SD0100 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $405 $43 Implemented
SF0045 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $11,628 $9,140 Implemented
SF0045 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $386 $300 Implemented
SF0044 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,035 $5,600 Not Implemented
SF0044 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $748 $837 Implemented
SF0044 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,511 $2,628 Implemented
SF0044 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,306 $900 Implemented
SF0044 # 01 Y:1994 01 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,307 $5,375 Not Implemented
SF0044 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,174 $832 Not Implemented
SF0044 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $194 $223 Implemented
SD0099 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,306 $7,840 Implemented
SD0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $28,013 $50,500 Not Implemented