IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0374 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,963 $2,837 Implemented
SF0374 # 05 Y:2009 05 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,402 $3,037 Implemented
SF0374 # 06 Y:2009 06 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,888 $9,574 Implemented
SF0374 # 07 Y:2009 07 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,939 $12,500 Implemented
SF0374 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,237 $33,968 Implemented
SF0374 # 09 Y:2009 09 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $51,835 $40,007 Implemented
SF0374 # 10 Y:2009 10 2009 USE PHOTOCELL CONTROLS $18,403 $18,196 Implemented
SF0374 # 11 Y:2009 11 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,553 $5,659 Implemented
SF0374 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,489 $4,385 Implemented
SF0374 # 13 Y:2009 13 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,217 $4,719 Implemented
SF0374 # 14 Y:2009 14 2009 INSTALL OCCUPANCY SENSORS $701 $1,567 Implemented
SF0374 # 15 Y:2009 15 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,809 $31,988 Not Implemented
SF0374 # 16 Y:2009 16 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,002 $318 Implemented
SF0374 # 17 Y:2009 17 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $89,029 $326,072 Implemented
SF0374 # 18 Y:2009 18 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,622 $86,476 Implemented
SF0374 # 19 Y:2009 19 2009 RECOVER AND REUSE COOLING WATER $23,524 $15,018 Not Implemented
SF0373 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $1,103 $0 Implemented
SF0373 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,700 $3,605 Implemented
SF0373 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,227 $1,320 Implemented
SF0373 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $335 $553 Implemented
SF0373 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $765 $1,569 Not Implemented
SF0373 # 06 Y:2009 06 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $402 $906 Implemented
SF0373 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,543 $12,880 Implemented
SF0373 # 08 Y:2009 08 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $32,866 $534,450 Not Implemented
SF0370 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $316 $0 Not Implemented