Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2009 |
Principal Product | Citrus Juice and Oil |
NAICS | 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | <$500,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 500,000 Tons |
Production Hrs. Annual | 7,488 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $944,457 | 8,597,325 | kWh | $0.11 |
Electricity Demand | $417,327 | 76,974 | kW-months/year | $5.42 |
Natural Gas | $1,432,584 | 140,957 | MMBtu | $10.16 |
TOTAL ENERGY COSTS | $2,794,368 | |||
RECOMMENDED SAVINGS* | $398,349 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $361,016 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $45,410 Cost: - |
- | - | - | - | $45,410 | 4,735 | - | - |
- - kWh |
- - kW-months/year |
$45,410 4,735 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $13,699 Cost: - |
- | - | - | - | $13,699 | 1,496 | - | - |
- - kWh |
- - kW-months/year |
$13,699 1,496 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $10,627 Cost: $2,372 |
- | - | - | - | $10,627 | 1,046 | - | - |
- - kWh |
- - kW-months/year |
$10,627 1,046 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $9,963 Cost: $2,837 |
$9,963 | 90,698 | - | - | - | - | - | - |
$9,963 90,698 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $5,402 Cost: $3,037 |
$5,061 | 46,071 | $341 | 63 | - | - | - | - |
$5,061 46,071 kWh |
$341 63 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $15,888 Cost: $9,574 |
$15,888 | 144,634 | - | - | - | - | - | - |
$15,888 144,634 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $17,939 Cost: $12,500 |
$17,939 | 163,305 | - | - | - | - | - | - |
$17,939 163,305 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $48,237 Cost: $33,968 |
$48,237 | 439,113 | - | - | - | - | - | - |
$48,237 439,113 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $51,835 Cost: $40,007 |
$51,835 | 471,870 | - | - | - | - | - | - |
$51,835 471,870 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $18,403 Cost: $18,196 |
$18,403 | 167,525 | - | - | - | - | - | - |
$18,403 167,525 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,553 Cost: $5,659 |
$3,553 | 32,344 | - | - | - | - | - | - |
$3,553 32,344 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,489 Cost: $4,385 |
$2,245 | 20,433 | $244 | 45 | - | - | - | - |
$2,245 20,433 kWh |
$244 45 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $2,217 Cost: $4,719 |
$2,217 | 20,181 | - | - | - | - | - | - |
$2,217 20,181 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $701 Cost: $1,567 |
$701 | 6,378 | - | - | - | - | - | - |
$701 6,378 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $13,809 Cost: $31,988 |
$13,809 | 47,758 | - | - | - | - | - | - |
$13,809 47,758 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,002 Cost: $318 |
$8,279 | 75,634 | $723 | 133 | - | - | - | - |
$8,279 75,634 kWh |
$723 133 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $89,029 Cost: $326,072 |
$66,495 | 605,328 | $22,534 | 4,157 | - | - | - | - |
$66,495 605,328 kWh |
$22,534 4,157 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $16,622 Cost: $86,476 |
- | - | - | - | $16,622 | 1,636 | - | - |
- - kWh |
- - kW-months/year |
$16,622 1,636 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
19: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $23,524 Cost: $15,018 |
- | - | - | - | - | - | $23,524 | 39,207 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$23,524 39,207 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $398,349 Cost: $598,693 |
$264,625 | 2,331,272 | $23,842 | 4,398 | $86,358 | 8,913 | $23,524 | 39,207 | $264,625 2,331,272 kWh |
$23,842 4,398 kW-months/year |
$86,358 8,913 MMBtu |
$23,524 39,207 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $361,016 Cost: $551,687 |
$250,816 | 2,283,514 | $23,842 | 4,398 | $86,358 | 8,913 | - | - | $250,816 2,283,514 kWh |
$23,842 4,398 kW-months/year |
$86,358 8,913 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |