IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0586 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,460 $0 Implemented
SD0586 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,882 $330 Implemented
SD0586 # 06 Y:2019 06 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,834 $2,795 Implemented
SD0586 # 07 Y:2019 07 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,750 $350 Implemented
SD0586 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,943 $750 Not Implemented
SF0543 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $6,639 $23,288 Implemented
SF0543 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,652 $12,363 Implemented
SF0543 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,772 $757 Implemented
SF0543 # 02 Y:2019 02 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $24,608 $15,012 Implemented
SF0543 # 03 Y:2019 03 2019 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $637 $654 Implemented
SF0543 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,245 $4,917 Implemented
SF0542 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,762 $0 Implemented
SF0542 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,796 $1,080 Implemented
SF0542 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,079 $180 Not Implemented
SF0542 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,409 $1,384 Implemented
SF0542 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $143 $111 Not Implemented
SF0542 # 06 Y:2019 06 2019 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $3,054 $9,087 Implemented
SF0542 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,214 $49,905 Implemented
SD0585 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $2,188 $3,520 Not Implemented
SD0585 # 02 Y:2019 02 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,628 $12,000 Not Implemented
SD0585 # 05 Y:2019 05 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,928 $14,000 Not Implemented
SD0585 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $8,453 Implemented
SD0585 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $2,603 $200 Implemented
SF0541 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $261 $578 Implemented
SF0541 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,964 $5,000 Implemented