IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0196 # 01 Y:1990 01 1990 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,037 $250 Implemented
CO0144 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,650 $500 Implemented
CO0144 # 03 Y:1989 03 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,856 $1,500 Implemented
CO0144 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $963 $0 Implemented
CO0144 # 06 Y:1989 06 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,942 $3,500 Implemented
CO0144 # 07 Y:1989 07 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $678 $200 Implemented
CO0144 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $500 $450 Implemented
CO0144 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $267 Implemented
CO0118 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,193 $500 Implemented
CO0118 # 04 Y:1988 04 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $522 $700 Implemented
CO0118 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,130 $2,000 Implemented
CO0072 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,255 $20 Implemented
CO0073 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $999 $300 Implemented
CO0072 # 01 Y:1986 01 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,672 $75,000 Implemented
CO0072 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,883 $500 Implemented
CO0073 # 01 Y:1986 01 1986 IMPROVE LUBRICATION PRACTICES $30,451 $0 Implemented
CO0073 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $15,180 $3,000 Implemented
CO0073 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,061 $200 Implemented
CO0073 # 05 Y:1986 05 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,212 $800 Implemented
CO0073 # 06 Y:1986 06 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,876 $4 Implemented
CO0073 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,183 $0 Implemented
CO0073 # 10 Y:1986 10 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $382 $50 Implemented
CO0073 # 11 Y:1986 11 1986 INSTALL SET-BACK TIMERS $3,538 $1,879 Implemented
CO0014 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,970 $1,000 Implemented
CO0014 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,292 $300 Implemented