IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0346 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $700 Not Implemented
MA0346 # 08 Y:1995 08 1995 REDUCE SCRAP PRODUCTION $40,068 $56,350 Not Implemented
MA0346 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $14,227 $25,000 Not Implemented
HO0107 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,552 $6,151 Implemented
HO0107 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,441 $1,363 Implemented
HO0107 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,318 $1,000 Not Implemented
HO0107 # 04 Y:1995 04 1995 KEEP BOILER TUBES CLEAN $31,212 $2,500 Not Implemented
MA0284 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $689 $685 Implemented
MA0284 # 02 Y:1993 02 1993 ADD AREA LIGHTING SWITCHES $761 $600 Not Implemented
MA0284 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $1,095 Not Implemented
MA0284 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $290 $234 Not Implemented
MA0284 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $158 $0 Implemented
MA0284 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $181 $218 Not Implemented
MA0245 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,316 $0 Not Implemented
MA0245 # 02 Y:1992 02 1992 REDESIGN PROCESS $4,412 $1,554 Implemented
MA0245 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $2,833 $5,040 Implemented
MA0245 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,237 $0 Implemented
MA0246 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,746 $3,614 Not Implemented
MA0246 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,358 $2,672 Implemented
MA0246 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,995 Not Implemented
MA0246 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $0 Implemented
MA0246 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $386 Implemented
MA0246 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $100 $85 Implemented
MA0238 # 01 Y:1992 01 1992 USE OPTIMUM TEMPERATURE $22,238 $2,775 Not Implemented
MA0238 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,104 $0 Not Implemented