IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0184 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $1,410 $657 Implemented
MA0184 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $5,188 $1,277 Implemented
MA0184 # 06 Y:1990 06 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,410 $2,620 Implemented
MA0177 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,107 $14,700 Not Implemented
MA0177 # 02 Y:1990 02 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,876 $21,853 Not Implemented
MA0177 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $822 $120 Implemented
MA0177 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,411 $8,500 Implemented
MA0142 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,859 $570 Implemented
MA0142 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $39,982 $5,700 Not Implemented
MA0142 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $42,075 $45,870 Not Implemented
MA0142 # 04 Y:1989 04 1989 INSTALL SET-BACK TIMERS $6,809 $900 Not Implemented
MA0142 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $43,200 $381,000 Not Implemented
MA0142 # 06 Y:1989 06 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $27,100 $13,000 Implemented
MA0142 # 07 Y:1989 07 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $52,700 $680 Implemented
MA0053 # 01 Y:1986 01 1986 RECOVER WASTE HEAT FROM EQUIPMENT $8,920 $8,800 Not Implemented
MA0053 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $850 Not Implemented
MA0053 # 03 Y:1986 03 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $250 Not Implemented
MA0053 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,047 $190 Not Implemented
MA0053 # 05 Y:1986 05 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,381 $30 Not Implemented
MA0053 # 06 Y:1986 06 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $25,584 $22,400 Not Implemented
MA0053 # 07 Y:1986 07 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,447 $7,700 Not Implemented
MA0053 # 08 Y:1986 08 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,022 $35,300 Not Implemented
MA0050 # 01 Y:1985 01 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,247 $16,000 Not Implemented
MA0050 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $1,558 $1,600 Implemented
MA0050 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $55 Implemented