IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0252 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,026 $33,800 Not Implemented
MA0251 # 07 Y:1992 07 1992 INSTALL SET-BACK TIMERS $273 $90 Not Implemented
MA0251 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,639 $500 Implemented
MA0251 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,099 $2,050 Implemented
MA0251 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,191 $4,450 Implemented
MA0251 # 03 Y:1992 03 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,623 $2,472 Implemented
MA0251 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $9,500 $1,316 Implemented
MA0251 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $15,064 $40,000 Not Implemented
MA0251 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $243 $300 Implemented
MA0252 # 01 Y:1992 01 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $152,380 $100,000 Implemented
MA0252 # 03 Y:1992 03 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $17,456 $55,777 Not Implemented
MA0252 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $8,460 $4,239 Not Implemented
MA0252 # 05 Y:1992 05 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,342 $0 Implemented
MA0252 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,254 $600 Implemented
MA0252 # 07 Y:1992 07 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $969 $3,289 Not Implemented
MA0247 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,619 $1,500 Implemented
MA0250 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $157,407 $100,000 Not Implemented
MA0250 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $39,404 $1,280 Implemented
MA0250 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,414 $25,738 Not Implemented
MA0247 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $801 $12 Implemented
MA0247 # 04 Y:1992 04 1992 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $335 $990 Implemented
MA0247 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,936 $1,200 Implemented
MA0247 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $4,947 $1,780 Not Implemented
MA0247 # 01 Y:1992 01 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,161 $23,631 Implemented
MA0250 # 05 Y:1992 05 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,289 $0 Implemented