IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0123 # 02 Y:1988 02 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,548 $21,500 Implemented
MA0123 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,090 $0 Implemented
MA0123 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,768 $229 Implemented
MA0083 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,912 $12,250 Implemented
MA0083 # 02 Y:1987 02 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $219 $132 Implemented
MA0083 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $1,084 $1,890 Implemented
MA0083 # 04 Y:1987 04 1987 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $21,576 $62,000 Implemented
MA0063 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $325 $60 Implemented
MA0063 # 03 Y:1986 03 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $428 $586 Implemented
MA0063 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,963 $450 Implemented
MA0063 # 05 Y:1986 05 1986 REPAIR OR REPLACE STEAM TRAPS $5,083 $200 Implemented
MA0051 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $377 $75 Implemented
MA0051 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,235 $248 Implemented
MA0051 # 03 Y:1986 03 1986 REPAIR OR REPLACE STEAM TRAPS $14,400 $650 Implemented
MA0051 # 05 Y:1986 05 1986 INSTALL EFFICIENT RECTIFIERS $8,784 $40,000 Implemented
MA0038 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $300 Implemented
MA0038 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,400 $2,938 Implemented
MA0038 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $112 Implemented
MA0038 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,867 $500 Implemented
MA0038 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $10,939 $2,229 Implemented