Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0593 # 13 Y:2006 | 13 | 2006 | COVER OPEN TANKS | $1,309 | $1,470 | Implemented |
MA0593 # 12 Y:2006 | 12 | 2006 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $3,677 | $1,639 | Implemented |
MA0593 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $3,510 | $3,010 | Implemented |
MA0593 # 10 Y:2006 | 10 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,718 | $12,500 | Implemented |
MA0593 # 09 Y:2006 | 09 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,140 | $6,500 | Not Implemented |
MA0593 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,919 | $170 | Implemented |
MA0593 # 07 Y:2006 | 07 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $15,042 | $22,620 | Implemented |
MA0593 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,728 | $112,064 | Implemented |
MA0593 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $39,365 | $150 | Implemented |
MA0593 # 03 Y:2006 | 03 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $41,651 | $69,000 | Implemented |
MA0593 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $32,612 | $45,522 | Implemented |
MA0593 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,990 | $50,000 | Implemented |
MA0593 # 06 Y:2006 | 06 | 2006 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $16,246 | $4,000 | Implemented |
MA0596 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,740 | $5,440 | Implemented |
MA0596 # 12 Y:2006 | 12 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $360 | $900 | Not Implemented |
MA0596 # 04 Y:2006 | 04 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $9,148 | $4,500 | Implemented |
MA0596 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,400 | $37,895 | Implemented |
MA0596 # 06 Y:2006 | 06 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,195 | $13,000 | Implemented |
MA0596 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $4,855 | $8,000 | Implemented |
MA0596 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,870 | $18,200 | Not Implemented |
MA0596 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,026 | $5,350 | Implemented |
MA0596 # 10 Y:2006 | 10 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,415 | $9,840 | Implemented |
MA0596 # 11 Y:2006 | 11 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $458 | $0 | Not Implemented |
MA0596 # 02 Y:2006 | 02 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,617 | $75,860 | Implemented |
MA0596 # 01 Y:2006 | 01 | 2006 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $50,414 | $4,000 | Implemented |