Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0196 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,088 | $0 | Implemented |
LE0196 # 08 Y:2004 | 08 | 2004 | OPTIMIZE PLANT POWER FACTOR | $7,875 | $11,050 | Not Implemented |
LE0196 # 07 Y:2004 | 07 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $9,536 | $8,000 | Not Implemented |
LE0196 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,457 | $0 | Implemented |
LE0196 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,917 | $57,000 | Implemented |
LE0196 # 04 Y:2004 | 04 | 2004 | MINIMIZE WATER USAGE | $16,092 | $2,000 | Not Implemented |
LE0196 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,639 | $5,000 | Implemented |
LE0196 # 02 Y:2004 | 02 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $27,869 | $27,000 | Not Implemented |
LE0196 # 01 Y:2004 | 01 | 2004 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $63,437 | $239,000 | Not Implemented |
LE0182 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,612 | $10,336 | Not Implemented |
LE0182 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,756 | $94,677 | Not Implemented |
LE0182 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $577 | $0 | Implemented |
LE0182 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,437 | $300 | Implemented |
LE0182 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $9,794 | $9,794 | Not Implemented |
LE0182 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM THICKNESS INSULATION | $12,028 | $752 | Not Implemented |
LE0178 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,185 | $6,000 | Not Implemented |
LE0178 # 12 Y:2004 | 12 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $505 | $0 | Not Implemented |
LE0178 # 11 Y:2004 | 11 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $0 | Not Implemented |
LE0178 # 10 Y:2004 | 10 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $761 | $0 | Not Implemented |
LE0178 # 09 Y:2004 | 09 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,371 | $0 | Not Implemented |
LE0178 # 08 Y:2004 | 08 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,521 | $6,250 | Not Implemented |
LE0178 # 07 Y:2004 | 07 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,837 | $2,500 | Not Implemented |
LE0178 # 06 Y:2004 | 06 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,940 | $0 | Not Implemented |
LE0178 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $5,757 | $720 | Not Implemented |
LE0178 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,515 | $300 | Not Implemented |