Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2004 |
Principal Product | Silicone Rubber / PTFE Laminates |
NAICS | 315990 - Apparel Accessories and Other Apparel Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 25,000,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | DE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $274,137 | 8,233,665 | kWh | $0.03 |
Electricity Demand | $255,683 | 24,368 | kW-months/year | $10.49 |
Natural Gas | $255,683 | 37,876 | MMBtu | $6.75 |
TOTAL ENERGY COSTS | $785,503 | |||
RECOMMENDED SAVINGS* | $61,432 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $15,185 Cost: $6,000 |
- | - | - | - | - | - | $15,185 | 2,243 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$15,185 2,243 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,795 Cost: $75,903 |
$5,577 | 169,004 | $2,730 | 260 | - | - | - | - | - | - | $4,488 | - |
$5,577 169,004 kWh |
$2,730 260 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$4,488 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $7,543 Cost: $750 |
- | - | - | - | - | - | $7,543 | 1,114 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$7,543 1,114 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,515 Cost: $300 |
$4,042 | 122,485 | $2,473 | 236 | - | - | - | - | - | - | - | - |
$4,042 122,485 kWh |
$2,473 236 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,757 Cost: $720 |
$5,757 | 174,455 | - | - | - | - | - | - | - | - | - | - |
$5,757 174,455 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $4,940 Cost: - |
- | - | - | - | - | - | - | - | $4,940 | 78,000 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$4,940 78,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,837 Cost: $2,500 |
- | - | $3,837 | 365 | - | - | - | - | - | - | - | - |
- - kWh |
$3,837 365 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,521 Cost: $6,250 |
- | - | - | - | $1,521 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,521 - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,371 Cost: - |
- | - | $1,371 | 392 | - | - | - | - | - | - | - | - |
- - kWh |
$1,371 392 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $761 Cost: - |
$430 | 13,021 | $331 | 32 | - | - | - | - | - | - | - | - |
$430 13,021 kWh |
$331 32 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $702 Cost: - |
$702 | 21,285 | - | - | - | - | - | - | - | - | - | - |
$702 21,285 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $505 Cost: - |
$505 | 15,306 | - | - | - | - | - | - | - | - | - | - |
$505 15,306 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,432 Cost: $92,423 |
$17,013 | 515,556 | $10,742 | 1,285 | $1,521 | - | $22,728 | 3,357 | $4,940 | 78,000 | $4,488 | - | $17,013 515,556 kWh |
$10,742 1,285 kW-months/year |
$1,521 - $ |
$22,728 3,357 MMBtu |
$4,940 78,000 lb |
$4,488 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost |