IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0376 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $234,414 $800 Not Implemented
MI0376 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $205,000 $1,013,224 Not Implemented
MI0376 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $55,477 $1,980 Not Implemented
MI0376 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,854 $580 Not Implemented
MI0376 # 05 Y:2020 05 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $6,695 $5,875 Not Implemented
MI0376 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,838 $9,120 Implemented
MI0376 # 07 Y:2020 07 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,944 $440 Not Implemented
MI0367 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,517 $2,480 Implemented
MI0367 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,331 $2,480 Implemented
MI0367 # 02 Y:2020 02 2020 USE BATTERY STORAGE FOR DEMAND CONTROL $21,335 $38,237 Not Implemented
MI0367 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $1,980 Not Implemented
MI0367 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,815 $120 Implemented
MI0367 # 06 Y:2020 06 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,241 $4,900 Not Implemented
MI0367 # 07 Y:2020 07 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,190 $2,500 Not Implemented
MI0367 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,479 $9,842 Implemented
MI0278 # 01 Y:2015 01 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $103,740 $220,000 Not Implemented
MI0278 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $94,012 $102,610 Not Implemented
MI0278 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $45,923 $79,106 Implemented
MI0278 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,431 $9,248 Implemented
MI0278 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,235 $1,660 Implemented
MI0278 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $4,706 $2,901 Implemented
MI0278 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,391 $8,360 Implemented
MI0278 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $671 $1,880 Implemented
MI0278 # 10 Y:2015 10 2015 USE OPTIMUM THICKNESS INSULATION $711 $610 Implemented
MI0278 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,181 $40 Implemented