IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0126 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,683 $18,125 Not Implemented
UF0126 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $46,162 $114,584 Implemented
UF0126 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,087 $149,527 Not Implemented
UF0126 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,132 $2,000 Implemented
UF0126 # 06 Y:1995 06 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,503,626 $4,550,000 Not Implemented
UF0126 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $72,554 $0 Not Implemented
UF0126 # 08 Y:1995 08 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,181 $84,000 Not Implemented
UF0056 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,372 $350 Implemented
UF0056 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $560 $1,620 Not Implemented
UF0056 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $9,259 $15,000 Not Implemented
UF0056 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,682 $6,727 Implemented
UF0056 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,417 $680 Implemented
UF0056 # 06 Y:1993 06 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,758 $6,000 Not Implemented
UF0056 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $1,450 Implemented
UF0051 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,311 $6,715 Not Implemented
UF0051 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $1,536 $5,520 Not Implemented
UF0051 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,768 $7,202 Implemented
UF0051 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,415 $9,640 Not Implemented
UF0051 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,119 $2,875 Not Implemented
UF0051 # 06 Y:1993 06 1993 USE POWER DURING OFF-PEAK PERIODS $54,774 $0 Not Implemented
UF0015 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,858 $3,000 Not Implemented
UF0015 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $0 Not Implemented
UF0015 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $280 $281 Not Implemented
UF0015 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $869 $0 Not Implemented
UF0015 # 05 Y:1991 05 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $95 $200 Not Implemented