IAC logo
IAC Assessment: UF0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Pine plywood
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 380
Plant Area (Sq.Ft.) 28,200
Annual Production 369,375 Thousand Feet
Production Hrs. Annual 8,520
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,156,491 43,490,915 kWh $0.05
LPG $76,682 12,656 MMBtu $6.06
TOTAL ENERGY COSTS $2,233,173
RECOMMENDED SAVINGS* $1,822,097 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,294
#|Description Savings
Cost
Status Electricity Usage Natural Gas Wood Electricity Usage Natural Gas Wood
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,672
Cost:
$9,944
$2,672 37,222 - - - - $2,672
37,222
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,683
Cost:
$18,125
$11,683 235,053 - - - - $11,683
235,053
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$46,162
Cost:
$114,584
$46,162 883,646 - - - - $46,162
883,646
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$74,087
Cost:
$149,527
$74,087 1,986,225 - - - - $74,087
1,986,225
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$25,132
Cost:
$2,000
$25,132 495,604 - - - - $25,132
495,604
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,503,626
Cost:
$4,550,000
$2,156,491 43,503,225 $(-1,366,270) (-323,760) $713,405 210,444 $2,156,491
43,503,225
kWh
$(-1,366,270)
(-323,760)
MMBtu
$713,405
210,444
MMBtu
07: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$72,554
Cost:
-
$72,554 - - - - - $72,554
-
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$86,181
Cost:
$84,000
- - - - $86,181 25,422 -
-
kWh
-
-
MMBtu
$86,181
25,422
MMBtu
TOTAL RECOMMENDED Savings:
$1,822,097
Cost:
$4,928,180
$2,388,781 47,140,975 $(-1,366,270) (-323,760) $799,586 235,866 $2,388,781
47,140,975
kWh
$(-1,366,270)
(-323,760)
MMBtu
$799,586
235,866
MMBtu
TOTAL IMPLEMENTED Savings:
$71,294
Cost:
$116,584
$71,294 1,379,250 - - - - $71,294
1,379,250
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Wood Electricity Usage Natural Gas Wood