IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0224 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $14,666 $2,135 Not Implemented
MI0224 # 06 Y:2012 06 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $996 $2,594 Implemented
MI0224 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,668 $80 Implemented
MI0224 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,947 $12,324 Implemented
MI0224 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,660 Implemented
MI0224 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,323 $3,480 Implemented
MI0224 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $1,230 Implemented
UF0408 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,404 $870 Implemented
UF0408 # 07 Y:2008 07 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,931 $0 Implemented
UF0408 # 06 Y:2008 06 2008 $44,425 $3,443 Not Implemented
UF0408 # 05 Y:2008 05 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,753 $1,551 Not Implemented
UF0408 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $0 Not Implemented
UF0408 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,339 $1,246 Implemented
UF0408 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,980 $15,208 Not Implemented
MI0127 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $34,584 $3,984 Not Implemented
MI0127 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,742 $46,506 Not Implemented
MI0127 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,532 $33,405 Implemented
MI0127 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,597 $1,074 Implemented
MI0127 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,247 $30 Not Implemented
MI0127 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,084 $4,800 Implemented
MI0127 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,640 $0 Not Implemented
MI0127 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,107 $3,878 Implemented
UF0305 # 08 Y:2002 08 2002 $2,340 $1,740 Not Implemented
UF0305 # 03 Y:2002 03 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,111 $27,450 Not Implemented
UF0305 # 02 Y:2002 02 2002 $1,516 $7,336 Implemented