IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

294

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0190 # 04 Y:2010 04 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,587 $700 Not Implemented
MI0190 # 05 Y:2010 05 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,758 $4,871 Not Implemented
MI0172 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,860 $8,778 Implemented
MI0172 # 01 Y:2008 01 2008 $126,000 $66,640 Not Implemented
MI0172 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,926 $83,640 Implemented
MI0172 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,695 $1,210 Implemented
MI0172 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $343 $24 Implemented
MI0172 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,883 $1,210 Implemented
MI0172 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $24 Implemented
MI0172 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $728 $1,200 Implemented
MI0161 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,779 $720 Implemented
MI0161 # 03 Y:2008 03 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,253 $1,800 Not Implemented
MI0161 # 02 Y:2008 02 2008 INCREASE EFFICIENCY OF TRUCKS $27,036 $41,580 Not Implemented
MI0161 # 01 Y:2008 01 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,580 $89,078 Implemented
MI0161 # 04 Y:2008 04 2008 INCREASE EFFICIENCY OF TRUCKS $50,304 $150,300 Not Implemented
MI0161 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,042 $1,032 Implemented
MI0161 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $295 $24 Implemented
MI0144 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,559 $22,932 Not Implemented
MI0144 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,115 $1,074 Not Implemented
MI0144 # 03 Y:2007 03 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,832 $6,430 Not Implemented
MI0144 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,578 $30 Not Implemented
MI0144 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,878 $135 Not Implemented
UF0385 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,050 $236 Not Implemented
UF0385 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,469 $686 Not Implemented
UF0385 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,322 $7,864 Not Implemented