IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0517 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131,032 $232,640 Implemented
UF0508 # 03 Y:2017 03 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,931 $12,400 Implemented
UF0508 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,144 $1,169 Implemented
UF0508 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,871 $700 Implemented
UF0508 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,071 $44,637 Implemented
UF0508 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,114 $20,000 Implemented
UF0508 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,193 $2,737 Implemented
UF0508 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,564 $0 Implemented
UF0508 # 07 Y:2017 07 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,384 $640 Implemented
UF0508 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $1,548 $478 Implemented
MI0296 # 10 Y:2016 10 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $926 $40 Implemented
MI0296 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $17,090 $208 Implemented
MI0296 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,550 $40 Implemented
MI0296 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $746 $440 Implemented
MI0296 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,548 $1,660 Implemented
MI0296 # 06 Y:2016 06 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,937 $4,464 Implemented
MI0296 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,576 $2,520 Implemented
MI0296 # 09 Y:2016 09 2016 MINIMIZE WATER USAGE $970 $2,200 Implemented
MI0293 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,349 $40 Implemented
MI0293 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,603 $1,660 Implemented
MI0293 # 03 Y:2016 03 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,663 $8,284 Implemented
MI0293 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,266 $3,600 Implemented
MI0293 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,469 $6,560 Implemented
MI0293 # 10 Y:2016 10 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,965 $40 Implemented
MI0293 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $8,400 Implemented