IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0362 # 10 Y:2019 10 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $288 $187 Implemented
MI0362 # 09 Y:2019 09 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,147 $1,090 Implemented
MI0362 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,148 $1,126 Implemented
MI0362 # 07 Y:2019 07 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,481 $185 Implemented
MI0362 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,851 $160 Not Implemented
MI0362 # 05 Y:2019 05 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,811 $1,120 Not Implemented
MI0362 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,814 $1,980 Implemented
MI0362 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $11,441 $3,600 Implemented
MI0362 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,454 $216,900 Not Implemented
MI0362 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $67,585 $640 Not Implemented
MI0354 # 11 Y:2019 11 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $218 $559 Implemented
MI0354 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $42,517 $105,476 Implemented
MI0354 # 10 Y:2019 10 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $538 $951 Implemented
MI0354 # 09 Y:2019 09 2019 USE SOLAR HEAT TO HEAT WATER $601 $2,205 Not Implemented
MI0354 # 08 Y:2019 08 2019 USE PHOTOCELL CONTROLS $1,366 $2,206 Implemented
MI0354 # 07 Y:2019 07 2019 AIR CONDITION ONLY SPACE NECESSARY $1,687 $240 Implemented
MI0354 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $2,156 $2,559 Implemented
MI0354 # 05 Y:2019 05 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,590 $8,800 Implemented
MI0354 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,262 $29,820 Not Implemented
MI0354 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $12,789 $3,600 Implemented
MI0354 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,459 $80,434 Implemented