IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

468

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0357 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,575 $160 Implemented
MI0357 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,870 $8,000 Implemented
MI0357 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,177 $2,193 Not Implemented
MI0357 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,689 $1,980 Implemented
MI0357 # 02 Y:2019 02 2019 USE SOLAR HEAT TO HEAT WATER $11,005 $67,338 Not Implemented
MI0357 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,306 $3,600 Implemented
UF0510 # 06 Y:2017 06 2017 INSTALL EQUIPMENT TO MOVE PRODUCT $944,640 $126,336 Implemented
UF0510 # 05 Y:2017 05 2017 AUTOMATE FINISHING PROCESS $84,346 $5,030 Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented
UF0510 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $1,142 $225 Not Implemented
UF0510 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $1,757 $0 Not Implemented
UF0510 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,528 $419 Implemented
MI0301 # 10 Y:2016 10 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $580 $3,880 Not Implemented
MI0301 # 11 Y:2016 11 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $540 $280 Implemented
MI0301 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,252 $2,200 Implemented
MI0301 # 08 Y:2016 08 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,288 $8,881 Implemented
MI0301 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $2,146 Not Implemented
MI0301 # 06 Y:2016 06 2016 USE OPTIMUM THICKNESS INSULATION $2,946 $2,710 Not Implemented
MI0301 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $322 Not Implemented
MI0301 # 04 Y:2016 04 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,075 $18,626 Not Implemented
MI0301 # 03 Y:2016 03 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,246 $2,379 Not Implemented
MI0301 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,990 $35,099 Implemented
MI0301 # 01 Y:2016 01 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,850 $1,120 Not Implemented
MI0298 # 12 Y:2016 12 2016 INSTALL OCCUPANCY SENSORS $552 $177 Not Implemented
MI0298 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $664 $760 Not Implemented