IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 314 Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0931 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,292 $3,500 Implemented
GT0931 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $2,451 $1,382 Implemented
GT0931 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,194 $25,005 Implemented
GT0931 # 04 Y:2019 04 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,893 $19,194 Not Implemented
GT0931 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,664 $4,500 Implemented
GT0931 # 06 Y:2019 06 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,047 $39,068 Not Implemented
GT0931 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $322 Implemented
GT0931 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $34 $131 Implemented
GT0931 # 09 Y:2019 09 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $52,800 $554,400 Not Implemented
GT0921 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,972 $32,568 Not Implemented
GT0921 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $947 $3,500 Implemented
GT0921 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $543 $847 Not Implemented
GT0921 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $1,446 $1,974 Not Implemented
GT0921 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $6,221 $200 Not Implemented
GT0920 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,569 $5,081 Implemented
GT0920 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,465 $3,500 Implemented
GT0920 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $360 $386 Implemented
GT0920 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $5,826 $1,645 Implemented
GT0920 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,551 $629 Implemented